2013
Owner: Al Ghanem Real Estate
The BIM model had the use of existing phases, demolishing, and new construction. Rebar was also modeled in 3D.
3 Basements + Ground + 8 Parkings + 30 Floors
2013
Owner: Al Ghanem Real Estate
The BIM model had the use of existing phases, demolishing, and new construction. Rebar was also modeled in 3D.
3 Basements + Ground + 8 Parkings + 30 Floors